Thursday, November 26, 2026

Happy Thanksgiving 2026


We're with the in-laws today and my Mom's in a couple days, otherwise I'll be enjoying being off work until Monday.  

If you celebrate the day or not, have a good one and an enjoyable weekend!



Wednesday, November 18, 2026

NRII - Part 15

Hang on, it gets 'fun' in this one.  You know the timeline, but I sent the email below back to Matt tonight.

11/13, Friday - Julia texted to see if Jake coming Monday afternoon works for me, and I assented.  At least they are paying attention to my request that work only happens when I'm here.

11/16, Monday - Jake texted me in the afternoon to see if he could show up early.  (At least they've paid attention to my request that no one show up without me knowing.)  I said yes, and arrived home to find him working less than an hour later.  He completed the work to be done shortly after sunset.

Jake was a good guy.  He saw the shoddy job and couldn't believe it, himself.  Here is what the seam between the porch and the house looks like now.


11/17, Tuesday - I received an email from Matt asking if I wanted a walk-through or if I was happy with things and would sign the completion form.  He also noted that I wanted to talk about a discount and asked what sort of discount I was looking for?  Okay, I'll have to spell it out:

* * *

Matt,

For starters it took 97 days for it to be completed, and there are still things I have to live with like an odd nub on the peak of the porch and cut shingles.  The salesman did not measure my existing gutters or the size of board needed to connect the house and porch, but there's more.  Let's take a look at the timeline:

8/11 Roof replaced.  I picked up 3 pails of garbage since, total.  Shingles overhung the gutters on the porch up to 2.5 inches, and the aforementioned nub.  The board connecting the porch to the house did not cover the old caulk that was there.  The board was cut but not painted, and right where a piece of flashing would have held water.  The other side reused the old flashing, bent up and not cleaned up at all.

8/13 & 14  Gutter crew arrived late afternoon.  My house gutters are six inch, but they arrived with 5 inch for the porch.  They asked me, and I sighed and figured 5 inch was adequate for the porch and let them proceed, but certainly not ideal.  When the porch gutters and gutter covers were completed they let me know they would be back the next day to put the gutter covers on the house since they only had 5 inch.

8/18  I texted Isaac, ignored.

8/20  I texted salesman Tony about Isaac not responding.  I finally spoke with Isaac later that day and we set up a meeting for the next Tuesday, 8/25, at 3:30 pm.  In the meantime I collected the third pail of garbage.

8/25  Arrived home from work expecting to meet Isaac, who apparently had shown up early to do some shoddy 'repairs' and was conveniently gone long before I got home, ignoring the fact we had a set time.  My wife happened to be home so he went to the door and tried to get her to sign off as complete.  Unacceptable.

8/26  I texted Julia asking for Isaac's supervisor's name and number since Isaac apparently did not want to meet with me.  Also, at 4:00 pm that day the leftover supplies got picked up - 15 days after the roof was replaced.

8/27  I was put into contact with you, Matt.  We spoke that afternoon and went over my issues, and made an appointment for 9/1.  You saw the issues, Matt, and at the time appeared to agree with me.  At this time I was still affable as things do happen and I understand that.

9/20  @12:00  I had bread about to come out of the oven and the Packers were lining up for the kickoff when I had two people come to my door and want me to show them the overhanging shingles.  I said no, I was busy and to go to the porch.  I should have told them to come back another time, but I wanted the job fixed.  My second concession to go along with the gutters.

9/22  I emailed you Matt, and it was ignored.

9/24  I received a text from someone at the roofing company saying that Isaac told them it was ready for a final walkthrough and asked to set up a time.  I replied that Isaac was mistaken.  I was dealing with Matt now and am still not satisfied.  I also noted that the communication with and apparently within your company was lacking.  The next day I received an apology text, and that you were out of office until the next Tuesday but they would check with you.

9/30  50 days after the roof was replaced Tony the salesman submitted my supplemental claim to the insurance company.  Still no word from you, Matt.  I had not had contact with you since 9/1.

10/7  I sent a follow up email to you, Matt.  Ignored again.

10/12 & 13  I finally texted you to verify if you even received my emails.  A day later I still had no response so I texted you again to state that going forward I do not want anyone showing up at the house to do anything without my prior knowledge and approval.  Six minutes later I received a text from you, apologizing and acknowledging that you did receive my emails and he would try his best to communicate better with me as they finish up my project and that I should look for an email shortly.  This is our first contact since 9/1, 42 days.

10/14  I received a text from you that you had not forgotten about me, you've just been so busy, but you would still get an email out to me with an update.

10/31  17 days later I received an email from you stating that you submitted a service request for Jake to complete the remaining items and that Jake would reach out to me "directly." 

11/4  You texted me to say that Jake "will be call you to schedule this completion service."  That's twice you said Jake himself would reach out.

11/5  I received a text from Julia, not Jake, to schedule a time for Jake to come out.  I then replied to your 10/31 email to state the things I would have discussed with Jake, had I spoken to him.

11/6  Julia texted again and we settled on the next Tuesday, 11/10, for Jake to meet me at 3:30.

11/9  Over the weekend I received payment for my supplemental insurance claim, Which was less than half of what Tony indicated I could get before I signed with your company.

11/10 I met Jake, and work was completed on 11/16.

Is this really acceptable to you?  I was promised an A+ BBB, Roofing Company of the Year, premium workmanship job.  And I bypassed lesser quotes to get that kind of service.  Did I get that kind of service, Matt?  

I have to live with this experience, a nub on my porch, cut shingles, shingles on the garage that are flush on one side and overhanging 1/2 to 3/4 inches on the other, .  And I have not walked on the house roof myself to look for other issues.  Should I hire someone to do that, Matt?  I want $4,000 knocked off the final bill.

Regards,

* * *

What do you think I'll get as a response?  If it's not anything I can work with I'm going to request a meeting with the owner.

Friday, November 13, 2026

Hamish

Also known to us as Mr Hamish, Mr Hamish Pie, Hamish Pie, Hamish Pie Guy, Little Pie Guy, and more along the same lines, but to me he was also my little buddy...

We let him go today.  We love you, Hamish, my little buddy.

Wednesday, November 11, 2026

New Roof II - Part 14

I wish I kept a consistent format for this, but the important thing is that it is here.  Ready for another new roof update?  Ready or not, here it is:


10/31, Sunday - I received an email from Matt.  He submitted an in-house service request for Jake to complete the remaining items (stated as a taller piece of trim over the porch and to adjust the pitch of the flashing over the garage.)  He also said Jake would be reaching out to me directly to coordinate scheduling.

11/4, Wednesday - I received a text from Matt.  Jake will call to schedule completion.

11/5, Thursday - I received a text from Julia, not Jake, for him to come out mid-late Friday morning.  I replied no, my wife is having surgery so we will be at the hospital, but I will be home Monday.

She replied, no problem, he can be there Wednesday around the same time.

I replied that other than Monday it would have to be 3:30 or later on a weekday or else on a weekend.  It's been almost 3 months, trust has eroded and I want to be here for anything done.  Thanks for understanding.

She replied back that she would check with the team to see what works.

I then replied to Matt's 10/31 email to state that the other side of the porch roof needs to be looked at as they reused the old flashing and there is a gap between that and the shingles and I just don't know what's underneath.  And the water diverter on the garage needs to be longer, not just adjusted.  These are things I would have discussed with Jake, but he did not reach out directly nor call, and he's not even the one who texted.  I also alluded to expecting a hefty consideration on the final bill for all of this.

11/6, Friday - Julia texted to see if Tuesday at 3:30 would be okay.  I said yes, though I may have to leave before 5 to pick up my car that goes in the shop on Monday.

11/9, Monday - Over the weekend I received payment for my supplemental claim on the roof.  It was less than half of what salesman Tony said I could expect.  I emailed Tony and Matt to point this out.

11/10, Tuesday - I met Jake, the company's 'fixer' or 'cleaner,' basically the back end service technician for the company, and the only one at that.  He saw what I saw, and has seen this bad of work before.  It was good meeting him and know that he sees it and can fix it.  He did not have everything he needed to complete repairs with him in his van, he said he was going off a general note given to him, but assured me he would be in touch and be back later in the week.  But while he was here he did alter the angle of the rain diverter on the garage.  Good enough, the porch is the important part and I want it to be over.


That's where it stands at this moment.  I still expect a good discount for the quality of work, sub-par (to say the least) communication, and length of time (3 months today) it's taking to complete.  I have a feeling I may be requesting a meeting with the owner of the company.

Monday, November 9, 2026

Expensive Updates

Another expensive day, today.  I had taken today off some time ago, and it came in handy.  Hamish had another vet appointment for an ultrasound today.  He's back home now but we still haven't gone over the results with the vet.  He has put on a few ounces this past week, but still is not feeling well, and his fur and demeanor easily reflect that.  Also, each of his ear tips droops a bit now due to putting medicine on them every day.  I'm not sure if those will recover as he will still need the medicine even if we get past this current state.  I feel so bad for him, but we're doing what we can.

My car also went into the shop this morning and, amazingly, we just picked it up.  I figured they'd have it at least two days, but I'm happy to have it back.  Oil change, new brakes and new shocks - another high expense.  These last few months have been brutal, financially.

Mostly what's been happening this past weekend is my wife recovering from surgery.  She had surgery on her sinuses on Friday morning and has been miserable ever since.  She didn't expect the recovery to be so painful or last more than a few days.  I'm glad she has the whole week off because she may need it all.  But the surgery went very well and she will fully recover eventually, thank you.

In other news, Jake from the roofing company is to be here after work tomorrow to do the needed repairs.  I have more timeline markers to post, tomorrow night or after.  In two days it will have been 3 months since the roof was replaced.

Well, with all that's been happening we haven't gotten any more yard work done.  The last few sunflowers are now dying due to the cold overnight temperatures the last couple days, but the highs have been getting up to about 60ºF, so not all that bad.  But that will change in a couple days.

This was a recent late night picture of Hamish not feeling so well.  And the sunflowers picture was taken a few days ago.  Not a long post today, but truthfully I don't feel much like writing.  I wanted to get this out there before the roof saga continues tomorrow.  Oh, and I've not even touched upon the Blue Wave yet.  Let the Tangerine Toddler temper tantrums begin!  Cheers, everyone.

Friday, November 6, 2026

Flour Power!

I made baguettes tonight and noticed a spot of moisture on the couche, which is kept in the freezer when not in use.  You don't want to wash a couche, but it was time for a cleaning and drying.  This is the first of two shake-outs, and I covered myself and everything around me in a dusting of flour.

It looks like snow in the air in front of the camera by the end.  I took it back in and used the potato scrubber on it in some places where it was caked on a bit before shaking it out again.  It's now hanging on a cleaned clothesline in the basement.  Tomorrow it will get one more shake then back in the freezer.   The baguettes turned out wonderful.

I have some recent news to write up soon, but for tonight I thought this was funny and I knew I had it on camera.  You can laugh, and please do, but how else would you do this?